Richmond County Hearing Planned for Amazon Data Center Air Permits

North Carolina environmental regulators will hold a Richmond County Amazon data center hearing Thursday evening in Rockingham.

The North Carolina Department of Environmental Quality’s Division of Air Quality will receive comments on two proposed air-quality permits connected to Amazon’s planned Energy Way Tech Campus near Hamlet.

The hearing begins at 6 p.m. Thursday, July 30, in Courtroom A of the Old Richmond County Courthouse. The courthouse is located at 114 East Franklin Street in Rockingham. Doors will open at 5:30 p.m.

Permits Cover Temporary and Emergency Power

The Richmond County Amazon data center hearing will address separate permit applications submitted by Duke Energy Progress and Amazon Data Services.

Duke Energy has applied to modify an existing air-quality permit so it can construct and operate 57 diesel-powered engines on Amazon’s property.

The engines would provide what Duke Energy describes as bridge power until the data center is connected to the electrical grid. Under the proposed permit, the temporary engines would have to be retired within one year after grid service begins.

Amazon has separately applied for an air-quality permit covering 588 diesel emergency engines. Those engines would provide backup power and would remain at the site after the temporary bridge-power equipment is removed.

DEQ Completes Preliminary Review

State regulators said air-dispersion modeling indicates emissions from each facility are not expected to violate health-based air-quality standards.

Both projects would require federal Title V major-source air permits. Amazon and Duke Energy would also be required to conduct emissions testing to demonstrate compliance with permit limits.

Public Comments Accepted Through July 31

Residents attending the Richmond County Amazon data center hearing may register to speak when they arrive. Oral comments should be limited to approximately three minutes.

Written comments may also be submitted during the hearing. Comments can be emailed to DAQ.publiccomments@deq.nc.gov using the subject line “Amazon.25A and DukeRichmond.26C.”

The public comment period closes Friday, July 31. Regulators will review the comments before making a final decision on the proposed permits.

Spanish interpretation will be available during the Richmond County Amazon data center hearing.

Share:

Facebook
Twitter
Pinterest
LinkedIn

Social Media

Most Popular

Stay connected to Sandhills.

Subscribe To Our Weekly Newsletter

We send one helpful email a week with new releases, special moments, and what’s coming up next.

Related Posts

Sandhills Local News

House Candidate Charles Taylor Files Defamation Lawsuit Over Campaign Mailer

Republican North Carolina House candidate Charles Taylor has filed a lawsuit against the Sandhills Citizens Alliance, alleging that statements in a campaign mailer were false and defamatory. The complaint was filed in Lee County Superior Court and seeks more than $25,000 in compensatory damages, along with punitive damages and other costs. Taylor disputes claims concerning a business operating on property he owns and the status of a complaint involving his financial-disclosure documents. The political action

Read More »
Sandhills Local News

Sanford Affordable-Housing Development Moves Forward

The City of Sanford and Brick Capital Community Development Corporation are moving forward with the new W.T. Wilson Ridge affordable-housing development. The first phase will include 16 apartments dedicated to permanent supportive housing and 12 single-family homes. Another 36 houses are planned for a later phase. The single-family homes will use a community-land-trust model. Brick Capital will retain ownership of the land, helping reduce the amount qualified buyers must finance. Sanford and Lee County have

Read More »
Sandhills Local News

Critical Home-Repair Assistance Available in Moore County

Some low-income Moore County homeowners may qualify for assistance with critical repairs through the Essential Single Family Rehabilitation Program. Eligible work can include roof, electrical, plumbing and HVAC repairs or replacements, along with accessibility improvements. The owner or a household member must generally be at least 62, disabled or a veteran. Certain homes with lead hazards and a child younger than six may also qualify. Assistance is structured as a zero-interest loan secured by a

Read More »